Wastage by Machine
Warp and weft wastage per loom, per design, per shift. Variance flags when a machine exceeds your threshold — before the shift ends.

Warp and weft wastage separately
Warp wastage and weft wastage are tracked independently per machine. You see which loom is losing warp, which is losing weft, and by how much — without combining them into a single vague number.
Variance flags by threshold
Set a target wastage percentage per design or per machine group. When a machine exceeds the threshold, the row is flagged. You see it in the current shift, not in the monthly report.
Wastage per design comparison
The same design running on two different looms with different wastage percentages. MobiOffice shows you both, side by side. Finding which machine needs attention becomes obvious.
Shift and period drill-down
Filter by shift, by week, by month. See wastage trend per machine over time. Spot whether a problem is getting better or worse without manual calculation.
Want to see wastage tracking running with your unit's data?
Send your loom count and current wastage challenge. We'll show you the screen.